Garden Gnome
©2006-2009


Like the rest of the house there is custom woodwork.
It is surprising how re-organizing and de-cluttering a closet of any kind can be so disruptive. The work is not difficult at all but everything that was in the closet ends up being spread everywhere as the only way to do this effectively is to completely empty the entire closet. Once the closet was completely empty my husband washed the ceiling and walls with a 1:1 vinegar solution. We removed any scuff marks with a Mr. Clean® Magic Eraser®. We washed the wood shelving and baseboards with Murphy Oil Soap solution.
All of the closets have some type of customized shelving to maximize storage. The closet in the soon to be craft room has some rather impressive customization that I will show in greater detail when we get to that room. The master bedroom closet has 3 wood shelves on each end of the closet to make use of space that would normally be wasted. It is surprising how much extra storage space this adds in the closet.
Chocolate Chip Cookies
When I was growing up fall cleaning signified the official end of summer. At one time it was common to do a complete attic to basement cleaning twice a year usually in the spring and in the fall. By complete cleaning I do mean complete from sweeping out the cobwebs in the attic to scrubbing down walls and ceilings. All the light fixtures were cleaned and polished, screens were removed from the window then after the windows were sparkling clean the storm windows were put into place. Floors were stripped then re-waxed. In the spring winter clothes and bedding were put away with the reverse in the fall. Quite often a couple of my Mom's friends would come over to help with the cleaning and in return she would help with theirs.
Rubbing Alcohol
Panasonic KX-TG6473 Phone System
Safety Plugs
Installed
Slippers
Thermals
When we moved in we immediately started replace the electrical outlets. There were a few issues with the older plugs and we really like the look of the European style outlets. Our main level bathroom while smaller but most used is slated for a complete renovation that will include ripping everything out and making it bigger. In order to do this we have to replace the furnace and hot water tank to free up room for the expansion. That means we did a quick paint job to make the bathroom presentable and changed out the outlets.
One of our outdoor outlets was missing part the weatherproofing cover. Now this outlet is controlled by an indoor switch that is always off unless the outlet is being used. Still this was a problem in terms of safety when the outlet was switched on. Not only that it just didn't look nice. The box itself was still fine so we picked up a replacement cover for $3.58. It took a bit of chiseling to remove some of the surrounding mortar but it really was a fairly easy repair.
Multi-Shutoff Water System
The Problem
Winterized
Cotton Towels & Cloths
In the Box
Carry Case
Inflated
Caulk
Insulating Foam
Indication
Dangerous Wire
Pipes
End of Day
Our first step was work in the walk-in pantry that is below the only room on the ground level which is a large entrance. We marked out the area in the pantry where the vent would be going through then carefully dug around to make sure there were no wires (1). Next we used a 4" cement drill bit (2) and marked on the outside (3) where we would be drilling. We decided drilling from the outside in would be a lot less mess indoors and it would keep the noise for the most part out of the house.
The drill went through the cement foundation wall (5) in about 4 inch segments. This actually took a lot more time than expected as you just can't rush the drill. Once the drill hit that mark my husband wacked out the plug (7) with a hammer and huge screwdriver. We ended up with 3 full sections of plugs plus a small one. They looked like the big beads the Flinstones might have worn! Then he drilled further until he finally broke through (6). Breaking through really meant we were able to free the hole of any debris and not actually drilling completely through. Had we drilled completely through we would have had quite the mess in the pantry! At the end of Thursday night we were left with a nice hole in our foundation that spanned from the outside into the pantry. We stuffed the hole with an old towel and called it a night. My husband was sore and achy from running the drill and it was getting hot an humid out so we figured on finishing the hook-up over the weekend.
We had all the materials ready for the hook-up that included rigid ducting, flexible ducting, elbows, a reducer, eco-friendly vent cover and metal duct tape (9). The first step was to install the eco-friendly vent cover on the exteriour (10) in the duct lined hole (11). This is a special Canadian made vent cover that is heavily insulated and saves energy (more here). I should mention when doing this type of DIY project go as energy efficient and eco-friendly as possible even if it costs a bit more. The vent cover is not only heavily insulated but during insulation a heavy application of caulking is applied assuring no air leaks later. The insulation and automatic valve closure via a specialized floating ball means there will be no transfer of cold air into the interiour of the house during the cold weather. The automatic valve also ensures that rodents and insects even if they somehow got through the vent grate system would not be able to get into the vent pipe itself.
The down draft system of a Jenn-Air® is an extremely powerful venting system. The main blower that moves the air to the outdoors is attached to the floor (12) which means moving these types of stoves is not quite all that easy. The back of the down draft (13) is the main area of interest. A short flexible metal hose runs from the air intake to the down draft exhaust (not shown but basically in line with the plug in 12). A rigid duct pipe runs from the outside vent (14) to the down draft exhaust (15). Each bend is carefully sealed with metal duct tape to keep the velocity in the duct.
Just outside of the kitchen patio doors there is a pit, brown circular object at beginning of the arrow. Water from the kitchen, rain water and two drains from the patio (one pictured end of arrow) (1) drain into this and from there travel down another solid pipe to the natural water way. We suspected a blockage of this solid pipe that forced water up and back into the house. The only solution was digging up the patio.
Pictured is the machine our plumber uses to snake the drains. A large coiled, flexible metal rod attaches to the front. It is then fed into the drain and the machine is turned on forcibly clearing any blockage. Additional rods are added as required. When the blockage is cleared is shows as a thick, black and very smelly sludge. In a normal system you would not see this as it would go directly into the sewage system. In our case we could both see and smell it!